BRG Pre-Call Cost & Quality Guide
Trusted by 100s of Melbourne homeowners
1. Realistic Melbourne Price Brackets
Targeted Repair
Shower Recess Overhaul
$9,999 – $15k
• Completed in under 8 working days
• Failed base stripped back to bare framing
• Primer + 3-coat waterproofing, screed, tiles & screen
• Failed base stripped back to bare framing
• Primer + 3-coat waterproofing, screed, tiles & screen
Most Popular
Full Bathroom Renovation
$19k – $25k
• Completed in under 14 working days
• Full strip-out to studs, licensed plumbing & electrical
• Waterproofing, tiling & fit-off (vs. $30k+ Melbourne avg)
• Full strip-out to studs, licensed plumbing & electrical
• Waterproofing, tiling & fit-off (vs. $30k+ Melbourne avg)
⚠ Important: Most jobs sit near the lower end of these ranges, and only increase based on project scope and how much hidden water damage needs to be repaired (extra materials + labour).
2. What Makes Us Loved By 100s of Homeowners
Standard Industry Quote
WHAT TO WATCH FORBRG Standard (Sheldon's Build)
+$2,900 VALUE INCLUDED
✗Salesperson quotes, subbies build
The person who quotes rarely steps foot on site.
→
✓Talk Directly With Sheldon (The Builder)
Sheldon personally quotes and completes your entire job, not a salesperson.
Direct Builder
INCLUDED AS STANDARD
✗Tiles laid on wet, compromised floors
Built over water-damaged timber where hidden rot is skipped.
→
✓Full Subfloor, Joist & Framing Repair
Joists, architraves, framing & leak markers checked; all rot is removed and rebuilt for a solid foundation.
$300 Value
INCLUDED AS STANDARD
✗Only 1 to 2 coats of waterproofing
Cheaper jobs rush coats, which can void product warranties.
→
✓Primer + 3-Coat Membrane + 10-Yr Warranty
Licensed applicator applied to spec, so the manufacturer covers & repairs any waterproofing failure.
$900 Value
INCLUDED AS STANDARD
✗Raised "step-up" walk-in showers
Built on top of the floor with an awkward trip lip.
→
✓True Stepless Showers (Cut Into Slab)
Jackhammered into the concrete slab for a flush, zero-lip entry.
$1,200 Value
INCLUDED AS STANDARD
✗4 to 6 week builds & no aftercare
Slow trade delays and hard to reach once paid.
→
✓Under 8/14-Day Finish & Leak Support
Firm finish dates, plus we come back if a leak ever shows.
$500 Value
INCLUDED AS STANDARD